Skip to content
Verde Solaire

Equipment

Panels, inverters and batteries we install

Figures verified on 16 Sept 2026. Every number links to its source on the sources page.

A subsidised rooftop system must use both the modules and the cells must be made in India, and since 1 June 2026 the cells must be on the ALMM List-II. Verde Solaire's quotes name the make and model of every panel and inverter so you can check them. This section explains what those names mean.

Sources

  1. 1.PM Surya Ghar Muft Bijli Yojna FAQsBSES Rajdhani, Sep 2025
  2. 2.MNRE clarifies ALMM List-II exemption for PM Surya Ghar usersTaiyangNews, 9 Jun 2026
  3. 3.MNRE opens one-month window for rooftop solar projects installed before June 1 to seek ALMM List-II exemptionPSU Watch, 16 Jun 2026
  4. 4.Case Study (Jama Corporation, Marwar Carpets)Verde Solaire, 5 Mar 2023
  5. 5.Solar power plant installation by Verde Solaire (10 kW, GK New Delhi, Adani bifacial)Verde Solaire, 27 May 2023
  6. 6.Solar Power Plant of 2 KW in Varanasi under PM Surya GharVerde Solaire, 22 Mar 2024
  7. 7.430 KW solar power plant at Dharuhera (Adani panels, Havells inverters)Verde Solaire, 30 Mar 2023

Get a written quote with named panels and inverter

A free site survey, a quote that names the make and model of every component, and the subsidy and net-metering paperwork filed for you.

WhatsApp